Condotta Idrogeno (Hydrogen Pipeline)
Client
ENI
Year
2020
Contract type
LS of Engineering Services
EMHS
10.000
Location
Venice, Italy
SOW
FEED

Simeco’s Scope of Work was the feasibility study and FEED of a 6’’ subsea hydrogen pipeline to interconnect Versalis petrochemical plants in Porto Marghera to Eni’s Venice Green Refinery.

The pipeline is designed to transport up to 12.000 Nm3/h of pure hydrogen @ 23 barg.

The study included: definition operating conditions of the pipeline and of the safety systems; selection of pipeline materials; study of the Drilling methodology: H.D.D. (Horizontal Directional Drilling), geotechnical and geological studies. Total pipeline length is approx 4 km. Length of HDD section is 2300 m. 