Skip to main content

Green Hydrogen

Image
Idrogeno Verde
Client
SNAM
Year
2022
Contract type
LS of Engineering Services
EMHS
1.500
Location
Italy
SOW
Feasibility Study

The Study analysed a 10 MW electrolysis plant producing 2000 Nm3/h of Green Hydrogen to be loaded on tube trailers for further distribution to hydrogen refuelling stations.

The electrolyser is connected to a 30 MW PV plant, to a 60 MWh Electricity Storage System (BESS) and to the national grid. 

Smart & sustainable engineering for industrial plants

DISCOVER SIMECO